Representative Projects

 

  • Imperial Oil (Stream) OU-01 Superfund Site Remediation
    Location:Morganville, New Jersey
    Client: USACE Kansas City and New York Districts

     

    Learn more

  • Y-12 Industrial Landfill IV Expansion
    Location: Oak Ridge, Tennessee 
    Client: UCOR

     

    Learn more

  • Hot Springs Tailings Dam
    Location: Hot Springs, Arkansas 
    Client: URS/Confidential Client

     

    Learn more

  • Los Alamos Airport Landfill Design/Build
    Location: Los Alamos, New Mexico 
    Client: U.S. Department of Energy

     

    Learn more

  • Complex Landfill Geotechnical Engineering
    Location: Essexville, Michigan
    Client: Consumers Energy

    Through a collaborative effort guided by the U.S. Fish & Wildlife Service, various studies indicated that certain sporting fish species such as the walleye and the endangered lake sturgeon were unable to progress past the dam, thereby limiting their spawning habitat since the original dam was constructed prior to the Civil War...

    Learn more

  • M1 Light Rail
    Location: Detroit, Michigan
    Client: Stacy and Witbeck, Inc. 

    CTI engineers and technicians provided material testing quality control for more than two years during this project to revitalize downtown Detroit light rail transit...

    Learn more

  • Frankenmuth Fish Passage
    Location: Frankenmuth, Michigan
    Client: USACE Detroit District

    Through a collaborative effort guided by the U.S. Fish & Wildlife Service, various studies indicated that certain sporting fish species such as the walleye and the endangered lake sturgeon were unable to progress past the dam, thereby limiting their spawning habitat since the original dam was constructed prior to the Civil War...

    Learn more

  • Maxey Flats Radioactive Waste Landfill
    Location: Fleming County, Kentucky
    Client: State of Kentucky

    As the principal engineering subcontractor to URS in the closure of the Maxey Flats Radioactive Waste Landfill for the State of Kentucky, CTI serves as a key partner on the remedial design engineering team, providing CERCLA remedial design and oversight of remedial actions for the closure of 200+ sumps and the installation of the 60+ acre final multi-layer closure cap.

    Learn more

  • Runway Design and Construction
    Location: Romulus, Michigan
    Client: Wayne County Airport Authority

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Ecorse Creek Improvements and CSO Program
    Location: Dearborn, Michigan
    Client: Wayne County, Michigan

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • K-732 Switchyard Demolition and Remediation
    Location: Oak Ridge, Tennesee
    Client: Department of Energy EMCBC

    The K-732 Switchyard Project, Oak Ridge, TN includes the demolition and asset recovery of a Manhattan Project vintage 5-acre electrical switchyard, a comprehensive site characterization to determine the type and extent of soil and concrete contamination, the remediation of soil and concrete to meet DOE cleanup requirements, and the restoration of the site for future use as a modernized switchyard.

    Learn more

  • Groundwater Extraction & Treatment System O&M
    Location: Rockaway Borough, New Jersey
    Client: USACE Kansas City District

    The K-732 Switchyard Project, Oak Ridge, TN includes the demolition and asset recovery of a Manhattan Project vintage 5-acre electrical switchyard, a comprehensive site characterization to determine the type and extent of soil and concrete contamination, the remediation of soil and concrete to meet DOE cleanup requirements, and the restoration of the site for future use as a modernized switchyard.

    Learn more

  • Portage Landfill Soil Cap Placement
    Location: Ravenna, Ohio
    Client: Ohio Environmental Protection Agency 

    CTI successfully competitively bid and won a design-build contract for a 30-acre orphaned landfill remediation project in northeast Ohio. CTI was tasked with the challenge of providing an acceptable design to the Ohio EPA for repairing extensive storm water damage, providing a properly constructed landfill soil cap, designing and constructing engineered storm water controls and addressing hydrostatic leachate outbreaks...

    Learn more

  • Site Inspection, Lower Hackensack River Site
    Location: Bergen and Hudson Counties, New Jersey
    Client: USACE Kansas City District

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Interim RCRA Action – Debris Removal
    Location: Saline, Michigan
    Client: Confidential

    CTI was selected by a large automotive client to manage the Interim Removal Action required on the 9.3-acre site by a RCRA closure under the authority of the U.S. EPA and MDEQ. The previous owner of the former automotive die casting facility partially demolished the building and associated site infrastructure in the 2000’s...

    Learn more

  • Test Track Engineering
    Location: Sterling Heights, Michigan
    Client: BAE Systems

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • In-Situ Remediation – NAS Hutchinson FUDS
    Location: Yoder, Kansas
    Client: USACE Kansas City District

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Fort Leonard Wood Streambank Stabilization
    Location: Fort Leonard Wood, Missouri
    Client: USACE Kansas City District

    Through our Preplaced Remedial Action Contract (PRAC) with the USACE Kansas City District, CTI was awarded Task Order 0002 for emergency streambank repairs at the Fort Leonard Wood (FLW) Army Installation. This project included emergency restoration of adjacent streambanks and in-stream structures that were damaged due to recent flash flooding events along the five FLW-012 Sewage Treatment Plant (STP) landfills...

    Learn more

  • Integrated Investigation & Remediation Strategy
    Location: Lexington, Tennessee
    Client: Confidential Client

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Detroit Arsenal Garrison D/B Water Distribution System
    Location: Warren, Michigan
    Client: USACE Louisville and Detroit Districts

    CTI, as Prime Contractor and in partnership with OHM, was responsible for the design, oversight, and general contracting performance of all phases of the Detroit Arsenal Garrison Base-Wide Water Distribution Replacement project.

    Learn more

  • Degognia & Fountain Bluff Levee and Drainage District
    Location: St. Louis, Missouri
    Client: USACE St. Louis District

    CTI is currently providing on-going engineering and construction services to USACE St. Louis District – Southern Residence District to excavate and repair collapsed CMP piping associated with a levee control structure. Following the repairs, slip-ling with 63-inch HDPE will be completed...

    Learn more

  • Sebewaing River Flood Control
    Location: Sebewaing Village, Michigan
    Client: USACE Detroit District

    CTI completed Phase 1 and Phase 2 construction of the Sebewaing River Flood Control project. The Sebewaing River is located on Saginaw Bay, in the thumb of Michigan, on the west shore of Lake Huron. Due to severe erosion and various penetrations through the earthen levee, the north levee embankment of the Sebewaing River was in need of maintenance to reduce the risk of failure during flood conditions...

    Learn more

  • Stormwater Management and POL System Improvements
    Location: Joliet, IL, Twinsburg, OH, Monclova, OH
    Client: US Army Reserve Command

    Prime Contractor for the storm water runoff and drainage improvements at 3 sites: Joliet Training Center in Elwood, Illinois; Twinsburg USARC in Twinsburg, Ohio; and Toledo Area Memorial USARC in Monclova, Ohio

    Learn more

  • Joliet AAP MMRP Feasibility Study
    Location: Will County, Illinois
    Client: USACE Louisville District

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Gregory Drainage and Levee District
    Location: Clark and Lewis Counties, Missouri
    Client: USACE Rock Island District

    CTI was selected as a preferred Contractor by the USACE Rock Island District for the 2013 Event Flood Damage Repairs for the Gregory Drainage and Levee District in Clark and Lewis Counties, Missouri. This flood repair project along the Mississippi River was completed within a period of performance of four months during the Fall of 2014...

    Learn more

  • Puget Sound Coastal Restoration
    Location: Kitsap County, Washington
    Client: USACE Kansas City District

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Fort Riley IRP Remediation Services
    Location: Fort Riley, Kansas
    Client: USACE Kansas City District

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • RCRA Corrective Action – Former Stanley Tools Facility
    Location: Fowlerville, Michigan
    Client: Confidential Client

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Remedial Process Optimization and Green Remediation Design
    Location: Dayton, Ohio
    Client: Wright Patterson Air Force Base

    CTI engineers designed a unique geosynthetic-reinforced earth traffic barrier system to allow heavy tracked vehicles to drive at high speed on pavement above a redeveloped brownfield...

    Learn more

  • Site Characterization of Chlorinated Solvent Contamination in Soil and Groundwater
    Location: Dayton, Ohio
    Client: Confidential

    CTI’s hydrogeologists and engineers developed an innovative site characterization approach to address chlorinated VOC contamination in soil and groundwater beneath and active manufacturing plant, and extending 1 mile downgradient...

    Learn more

Share this

Statement of Qualifications

DOWNLOAD

CCR Capabilities

DOWNLOAD

DOE Experience and Qualifications

DOWNLOAD

Accelerated Landfill Energy Recovery Technology (ALERT)

DOWNLOAD